Luohe Bawanggou rainwater pipe network dredging


The dredging of the rainwater pipe network in Bawanggou, Luohe, started from well YSB42024 to well YSB42023A (Seed Market-Funiushan Road YSB13851~YSB13846 section (Songshan Road-Pump Station), with a total of 26 construction workers, 7 17m³ and 22m suction trucks, 2 11m3 wine trucks, 3 Lijie 450 high-pressure dredging trucks, and 1 tool truck. The total length of the pipeline tested was 130.92 meters, the water consumption was 100 cubic meters, the sludge discharge volume was 414 cubic meters, and the dredging volume was 288 cubic meters.