Luohe Hanjiang Road rainwater pipe network dredging


The rainwater pipe network of Hanjiang Road in Luohe was dredged, starting from well Y09316 to well Y09333 (Baiyunshan Road bus stop to Lishan Road). In this well section, a private and disorderly connection problem was found at Jufuyuan. There was a $200 PVC pipe in the well. There were 22 construction workers, 2 23m³ sewage suction trucks, 2 11mm³ liquor trucks, 1 Lijie 450 high-pressure dredging truck, and 1 tool truck. The total length of the pipeline tested was 268 meters, the water consumption was 88 cubic meters, the sludge discharge volume was 161 cubic meters, and the dredging volume was 40.99 cubic meters.